Saturday 18 November 2017

Footpath Closure Extended

The work being undertaken on the Lisvane reservoir valve chamber is taking longer than expected, as it is in a worse state of repair than was anticipated and some bespoke fittings are having to be made to complete the work.  This means that Dŵr Cymru/Welsh Water need to extend the closure on the stretch of footpath running behind Rhyd-y-Blewyn Farm and 117 Black Oak Road.  It is now hoped that the path will be re-opened by Christmas.  A letter from Dŵr Cymru/Welsh Water has been sent out to local households but can also be accessed by clicking here.